Description Reconstruction of east/west streets to provide new sidewalks and other intersection and infrastructure improvements. These streets will become one-way, alternating between eastbound and westbound traffic. Why This Project? Improve east/west streets with new sidewalks and amenities
#10 Belmont Shared Street
Description Full reconstruction of Belmont Avenue as a plaza and shared street for all. Creates a flexible, pedestrian-oriented space that allows vehicle access to local businesses while serving as a community gathering space. Why This Project? Reconstruct Belmont Avenue as a shared street and
#9 12th Street: Taylor Avenue to May Street
Description Full reconstruction of 12th Street to provide wider sidewalks, the protected cycle track, and other streetscape amenities north of Taylor Avenue to May Street. Why This Project? Continued reconstruction of 12th Street with new sidewalks and the final cycle track north of Taylor
#8 12th Street: Belmont Avenue to Taylor Avenue
Description Full reconstruction of 12th Street in phases between Union Street and Taylor Avenue to provide wider sidewalks, the protected cycle track, and other streetscape amenities. 12th Street is designed as the neighborhood street — a local destination and nexus of neighborhood life. Why
#7 May Street Safe Route to School
Description Full street improvements along May Street between the roundabout and 12th Street including traffic signal improvements. Extends the interim cycle track from Taylor Avenue to May Street. Why This Project? Cycle track and street improvements along May Street for Safe Routes to School
#6 Bike Connection to Pacific Avenue
Description Restripe 12th Street, narrow the roadway, and widen the existing sidewalk with a new retaining wall to allow construction of a shared use path along the east side of 12th Street south of Union Street. Why This Project? Coordinate with ODOT to reconfigure and widen 12th Street from
#5 Belmont, 12th, and 13th Intersections & Two-Way Traffic
Description New intersection improvements at 12th Street, 13th Street, and Belmont Avenue; new medians and restriping on 13th Street and roundabout modifications for two-way traffic; interim cycle track on 12th Street. This project also closes Belmont Avenue to vehicles between 12th and 13th
#4 May Street and 13th Street Roundabout
Description New roundabout at the intersection of 13th and May Streets, designed to address existing issues, help maintain traffic flow, minimize delays, and provide safe crossings. The roundabout may be initially built with a single lane with additional turn lanes added as traffic volumes demand
#3 East Sidewalk Along 13th Street
Description New sidewalk and planting strip between (but not at) intersections along the east side of 13th Street. ADA curb ramps at every intersection from Taylor to Belmont Avenues. Why This Project? Create a comfortable walking environment along the east side of 13th Street to prepare for
#2 Taylor Avenue Neighborhood Connection
Description Full reconstruction of Taylor Avenue with the addition of a large shared use bike/ped path. Interim bike lanes added to 12th Street between Pine Street and Taylor Avenue to create a safe, comfortable bicycle and pedestrian route across the Heights. Why This Project? Establish
#1 Key East/West Crossings on 13th Street
Description Curb extensions, Rectangular Rapid Flashing Beacons (RRFBs), “Piano Key” crosswalks to improve access and safety at the key East/West crossings at Taylor Avenue and A Street crossing on 13th Street. Crossing enhancements are focused on two east/west crossing points. It is not best